Future wide area monitoring requirements for the GB transmission system
Author
Ashton, Phillip M. ; Taylor, Gareth A. ; Carter, Alex M.
Author_Institution
Brunel Inst. of Power Syst. (BIPS), Brunel Univ., Uxbridge, UK
fYear
2012
fDate
4-5 Dec. 2012
Firstpage
1
Lastpage
6
Abstract
The Phasor Measurement Unit (PMU) is deemed vital to achieving the wide area monitoring and control requirements of the Smart Grid. The devices are capable of capturing time synchronised power system quantities at a very high resolution and accuracy. They are intended to provide key control inputs to both, intra-network High Voltage DC (HVDC) links and potential Thyristor Controlled Series Capacitor (TCSC) installations. In order to successfully implement the necessary control systems a fully robust monitoring solution is required. In this paper we review the operational requirements of such a PMU based system in terms of improving the observability of the transmission network, ultimately guaranteeing security of supply. The existing system installed at National Grid is discussed.
Keywords
HVDC power transmission; observability; phasor measurement; power transmission control; smart power grids; synchronisation; thyristor applications; GB transmission system; HVDC link; PMU; TCSC; control requirement; high voltage DC; national grid; observability; phasor measurement unit; security; smart grid; thyristor controlled series capacitor; time synchronised power system; transmission network; wide area monitoring requirement; National Grid; PMU; WAMPAC; WAMS;
fLanguage
English
Publisher
iet
Conference_Titel
AC and DC Power Transmission (ACDC 2012), 10th IET International Conference on
Conference_Location
Birmingham
Electronic_ISBN
978-1-84919-700-7
Type
conf
DOI
10.1049/cp.2012.1990
Filename
6521289
Link To Document