• DocumentCode
    604020
  • Title

    Plug and play — Modular building solutions to reduce lead time, cost and increase flexibility

  • Author

    Olivas, Frumen ; Aragonez, O.

  • fYear
    2013
  • fDate
    11-19 April 2013
  • Firstpage
    1
  • Lastpage
    14
  • Abstract
    The following paper provides an overview of the opportunities and benefits of used shipping containers for modular construction in heavy industries. Surplus shipping containers have spawned construction industries and architectures for a wide range of end uses: homes, offices, apartments, school classrooms, dormitories, studios, and emergency shelters, to name a few. This paper will focus on their use in heavy industry, particularly for electrical rooms and control rooms. The paper will review a typical project highlighting the construction techniques and benefits realized.
  • Keywords
    construction industry; containers; cost reduction; architecture; construction benefit; construction industry; construction technique; control room; cost reduction; electrical room; heavy industry; lead time reduction; modular construction; surplus shipping container; Containers; Floors; Insulation; Loading; Modular construction; Steel;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Cement Industry Technical Conference (CIC), 2013 IEEE-IAS/PCA
  • Conference_Location
    Orlando, FL
  • ISSN
    2155-9139
  • Print_ISBN
    978-1-4673-5552-0
  • Type

    conf

  • DOI
    10.1109/CITCON.2013.6525277
  • Filename
    6525277