• DocumentCode
    613414
  • Title

    Overview and test results of modern pilot schemes for coordination of line distance protection relays

  • Author

    Bartosiewicz, E. ; Kowalik, R. ; Januszewski, M.

  • Author_Institution
    Inst. of Power Eng., Warsaw Univ. of Technol., Warsaw, Poland
  • fYear
    2013
  • fDate
    5-8 May 2013
  • Firstpage
    191
  • Lastpage
    196
  • Abstract
    The paper presents a short review of pilots schemes, which are available in modern line distance protection relays, and example results of common pilot schemes tests with the testing methods description. Some differences in implementations of selected pilot schemes have been shown for comparison reasons. Distance protection coordination functions have been tested for GE Multilin UR-series devices. Every type of available pilot scheme has been checked in synthetic test and during the real coordination between D60 and D90Plus devices. For POTT scheme, coordination between two L90 protections has been realized by a sort of available different telecommunication link types, for comparison reasons.
  • Keywords
    relay protection; testing; D60 device; D90Plus device; GE Multilin UR-series device; L90 protection; POTT scheme; distance protection coordination function; line distance protection relay coordination; pilot schemes test; testing method; Delays; Optical fiber networks; Performance evaluation; Power transmission lines; Protocols; Relays; Synchronous digital hierarchy; power system protection; substation protection; testing of power protection; transmission line;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Environment and Electrical Engineering (EEEIC), 2013 12th International Conference on
  • Conference_Location
    Wroclaw
  • Print_ISBN
    978-1-4673-3060-2
  • Type

    conf

  • DOI
    10.1109/EEEIC.2013.6549615
  • Filename
    6549615