DocumentCode
613414
Title
Overview and test results of modern pilot schemes for coordination of line distance protection relays
Author
Bartosiewicz, E. ; Kowalik, R. ; Januszewski, M.
Author_Institution
Inst. of Power Eng., Warsaw Univ. of Technol., Warsaw, Poland
fYear
2013
fDate
5-8 May 2013
Firstpage
191
Lastpage
196
Abstract
The paper presents a short review of pilots schemes, which are available in modern line distance protection relays, and example results of common pilot schemes tests with the testing methods description. Some differences in implementations of selected pilot schemes have been shown for comparison reasons. Distance protection coordination functions have been tested for GE Multilin UR-series devices. Every type of available pilot scheme has been checked in synthetic test and during the real coordination between D60 and D90Plus devices. For POTT scheme, coordination between two L90 protections has been realized by a sort of available different telecommunication link types, for comparison reasons.
Keywords
relay protection; testing; D60 device; D90Plus device; GE Multilin UR-series device; L90 protection; POTT scheme; distance protection coordination function; line distance protection relay coordination; pilot schemes test; testing method; Delays; Optical fiber networks; Performance evaluation; Power transmission lines; Protocols; Relays; Synchronous digital hierarchy; power system protection; substation protection; testing of power protection; transmission line;
fLanguage
English
Publisher
ieee
Conference_Titel
Environment and Electrical Engineering (EEEIC), 2013 12th International Conference on
Conference_Location
Wroclaw
Print_ISBN
978-1-4673-3060-2
Type
conf
DOI
10.1109/EEEIC.2013.6549615
Filename
6549615
Link To Document