DocumentCode :
614850
Title :
Multi-agent based joint production and maintenance scheduling considering human resources
Author :
Bouzidi-Hassini, Sabrina ; Benbouzid-Sitayeb, Fatima
Author_Institution :
Lab. LMCS, Ecole Super. d´Inf., Algiers, Algeria
fYear :
2013
fDate :
28-30 April 2013
Firstpage :
1
Lastpage :
5
Abstract :
Joint production and maintenance scheduling has been widely studied and many solutions have been proposed. However, all proposed solutions consider production tasks as maintenance ones. In fact, these task types have different constraints and can´t be planned similarly. In this paper, we propose a new joint production and maintenance scheduling that takes into account human resources availability and skills to propose realistic schedules. Multi Agent Systems are used for modeling the floor shop.
Keywords :
multi-agent systems; production control; scheduling; human resources availability; maintenance scheduling; multi agent systems; multiagent based joint production; Joints; Preventive maintenance; Production; Proposals; Schedules; Human resource constraints; Maintenance; Multi Agent schedulin; Planning; Production;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Modeling, Simulation and Applied Optimization (ICMSAO), 2013 5th International Conference on
Conference_Location :
Hammamet
Print_ISBN :
978-1-4673-5812-5
Type :
conf
DOI :
10.1109/ICMSAO.2013.6552675
Filename :
6552675
Link To Document :
بازگشت