• DocumentCode
    614850
  • Title

    Multi-agent based joint production and maintenance scheduling considering human resources

  • Author

    Bouzidi-Hassini, Sabrina ; Benbouzid-Sitayeb, Fatima

  • Author_Institution
    Lab. LMCS, Ecole Super. d´Inf., Algiers, Algeria
  • fYear
    2013
  • fDate
    28-30 April 2013
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    Joint production and maintenance scheduling has been widely studied and many solutions have been proposed. However, all proposed solutions consider production tasks as maintenance ones. In fact, these task types have different constraints and can´t be planned similarly. In this paper, we propose a new joint production and maintenance scheduling that takes into account human resources availability and skills to propose realistic schedules. Multi Agent Systems are used for modeling the floor shop.
  • Keywords
    multi-agent systems; production control; scheduling; human resources availability; maintenance scheduling; multi agent systems; multiagent based joint production; Joints; Preventive maintenance; Production; Proposals; Schedules; Human resource constraints; Maintenance; Multi Agent schedulin; Planning; Production;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Modeling, Simulation and Applied Optimization (ICMSAO), 2013 5th International Conference on
  • Conference_Location
    Hammamet
  • Print_ISBN
    978-1-4673-5812-5
  • Type

    conf

  • DOI
    10.1109/ICMSAO.2013.6552675
  • Filename
    6552675