DocumentCode
618822
Title
Process definition for reuse asset management process for software detailed design
Author
Promtaveepong, Tanawat ; Prompoon, Nakornthip
Author_Institution
Dept. of Comput. Eng., Chulalongkorn Univ., Bangkok, Thailand
fYear
2013
fDate
15-17 May 2013
Firstpage
1
Lastpage
5
Abstract
The software development life cycle consists of many steps, such as the planning stage, the design stage, the development stage etc. Each step produce assets that can be reused, based on the assets´ context, which can help reduce the initial capital and the time needed to develop software systems. At the same time, it improves the quality and productivity. However this is not possible if the organization is lacking best practices. This research proposes a Reuse Asset Management Process, based on the standard of ISO/IEC 12207:2008 and practices of the IEEE 1517:2010 standard, which deals with the software detailed design process, to serve as a guideline for process management.
Keywords
ISO standards; software development management; software reusability; IEEE 1517:2010 standard; ISO-IEC 12207:2008 standard; process definition; reuse asset management process; software design stage; software detailed design; software development life cycle; software development stage; software planning stage; Asset management; Guidelines; Organizations; Software; Software engineering; Standards organizations; Assets; Components; Detailed Design; Process Definition; Software Reuse;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical Engineering/Electronics, Computer, Telecommunications and Information Technology (ECTI-CON), 2013 10th International Conference on
Conference_Location
Krabi
Print_ISBN
978-1-4799-0546-1
Type
conf
DOI
10.1109/ECTICon.2013.6559609
Filename
6559609
Link To Document