DocumentCode :
620004
Title :
Priority rule based heuristics for project scheduling problems with multi-skilled workforce constraints
Author :
Chen Di ; Sun Fu-quan ; Liu Shi-xin ; Wang Yi-fan
Author_Institution :
Coll. of Inf. Sci. & Eng., Northeastern Univ., Shenyang, China
fYear :
2013
fDate :
25-27 May 2013
Firstpage :
1846
Lastpage :
1849
Abstract :
With the arrival of the knowledge economy society, the knowledge workforce has become the key resource in business activities replacing capital, equipment, raw material and other traditional resources. Project scheduling problems with multi-skilled workforce constraints (PSPMSWC) has been becoming a hot spot in project management. In this paper, according to the present research development, and the characteristics of the PSPMSWC, we present a two-stage heuristic algorithm, which is based on "work - skills - human" three layers. The goal is to minimize the makespan. The algorithm provides different choices to the same problem, and the computational results show that the algorithm is satisfactory.
Keywords :
commerce; human resource management; knowledge management; minimisation; project management; raw materials; scheduling; PSPMSWC; business activity; knowledge economy society; knowledge workforce; makespan minimisation; multiskilled workforce constraints; priority rule based heuristics; project management; project scheduling problem; raw material; Educational institutions; Heuristic algorithms; Job shop scheduling; Optimized production technology; Processor scheduling; Multi-skilled; Project scheduling; Two-stage heuristics algorithm; Workforce-constrained;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control and Decision Conference (CCDC), 2013 25th Chinese
Conference_Location :
Guiyang
Print_ISBN :
978-1-4673-5533-9
Type :
conf
DOI :
10.1109/CCDC.2013.6561233
Filename :
6561233
Link To Document :
بازگشت