DocumentCode :
620104
Title :
Study and application of project acceleration measures based on ACA
Author :
Zhao Ping ; Zhang Xiangwei
Author_Institution :
Civil Eng., Xi´an Univ. of Archit. & Technol., Xi´an, China
fYear :
2013
fDate :
25-27 May 2013
Firstpage :
2363
Lastpage :
2368
Abstract :
In order to control the project schedule delay problem efficiently in actual construction, the mathematical model of Multi-process Cross-operating Acceleration Measures is built based on improvement of process implementation mode function expression and analysis of process duration-cost relationship after considering the logical and resource constraints. Then the feasible project schedule of some engineering example can be achieved by solving the mathematical model with ant colony algorithm which contains elite strategy. The final results prove that it could provide rational references for actual acceleration construction by comparing with enumeration algorithm.
Keywords :
ant colony optimisation; construction industry; costing; mathematical analysis; project management; scheduling; ACA; acceleration construction; ant colony algorithm; elite strategy; enumeration algorithm; logical constraint; mathematical model; multiprocess cross-operating acceleration measures; process duration-cost relationship; process implementation mode function expression; project acceleration measures; project schedule delay problem; resource constraint; Acceleration; Construction; Educational institutions; Employment; Mathematical model; Optimization; Schedules; Acceleration Measures Model; Ant Colony Algorithm; Duration-cost Optimization; Multi-modes;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control and Decision Conference (CCDC), 2013 25th Chinese
Conference_Location :
Guiyang
Print_ISBN :
978-1-4673-5533-9
Type :
conf
DOI :
10.1109/CCDC.2013.6561333
Filename :
6561333
Link To Document :
بازگشت