• DocumentCode
    620107
  • Title

    Scheduling method for tire building based on heuristic algorithm

  • Author

    Shengping Yu ; Diancai Yang ; Kehui Zhu ; Shaowen Lu

  • Author_Institution
    Key Lab. of Process Ind. Autom. of Minist. of Educ., Northeastern Univ., Shenyang, China
  • fYear
    2013
  • fDate
    25-27 May 2013
  • Firstpage
    2380
  • Lastpage
    2383
  • Abstract
    There are more product specifications, great production and much equipment over the whole process of tire building. The actual complex scheduling problem of tire building is described in detail. To solve the complex multi-objective, large-scale production scheduling problem of tire building, a heuristic algorithm is proposed from the experience of the experts. The algorithm was tested by online data. Results show that the heuristic algorithm can quickly workout the optimal production scheduling of tire building, reduce the production cost, and improve productivity. The algorithm will lay the firm groundwork for application to production process in the future.
  • Keywords
    production management; scheduling; tyres; actual complex scheduling problem; heuristic algorithm; large-scale production scheduling problem; online data; optimal production scheduling; product specifications; production cost; production process; scheduling method; tire building; Buildings; Embryo; Job shop scheduling; Optimal scheduling; Tires; Heuristic Algorithm; Scheduling; Tire Building;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control and Decision Conference (CCDC), 2013 25th Chinese
  • Conference_Location
    Guiyang
  • Print_ISBN
    978-1-4673-5533-9
  • Type

    conf

  • DOI
    10.1109/CCDC.2013.6561336
  • Filename
    6561336