DocumentCode :
621707
Title :
IEC 61850 GOOSE transfer time measurement in development stage
Author :
Gonzalez-Redondo, Miguel J. ; Moreno-Munoz, Antonio ; Pallares-Lopez, Victor ; Real-Calvo, Rafael J. ; Lopez, Manuel A.Ortiz ; Moreno-Garcia, Isabel M.
Author_Institution :
Department of Computer Architecture, Electronics and Electronics Technology, University of Córdoba, Córdoba, Spain
fYear :
2013
fDate :
28-31 May 2013
Firstpage :
1
Lastpage :
6
Abstract :
IEC 61850 is one of the crucial standards within the Smart Grid concept. For performance evaluation of communications between Intelligent Electronic Devices (IED) in Power Utility Automation, the standard defines the Transfer Time. Measurement of such parameter is not available for end user, but in development stage it is possible. Third party products can be used to reduce development time of IEC 61850 compliant devices. An initial performance evaluation of these products can be achieved through the measurement of the Transfer Time.
Keywords :
IEC standards; Performance evaluation; Servers; Software; Substations; Time measurement; GOOSE; IEC 61850; Intelligent Electronic Device;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Electronics (ISIE), 2013 IEEE International Symposium on
Conference_Location :
Taipei, Taiwan
ISSN :
2163-5137
Print_ISBN :
978-1-4673-5194-2
Type :
conf
DOI :
10.1109/ISIE.2013.6563762
Filename :
6563762
Link To Document :
بازگشت