• DocumentCode
    622149
  • Title

    The financial risk of lossless shift factor in the ISO energy market and its resolution

  • Author

    Lo, Edward O. ; Qin Zhou

  • fYear
    2013
  • fDate
    3-4 June 2013
  • Firstpage
    244
  • Lastpage
    249
  • Abstract
    This paper presents the financial risk of Independent System Operators in using the DC-based shift factor in modeling transmission constraints in its market optimization model while transmission losses are accounted for in scheduling generation. The risk arises because DC-based shift factor is not able to account for the necessary marginal loss effect when the network becomes congested. Locational marginal price will under reflect the cost of energy at the load location. ISO energy revenue is under collected and could be below the congestion rent and thus could be inadequate for congestion revenue right settlement. In resolving the risk of energy inadequacy, this paper proposes the use of AC-based shift factor in the market optimization model. In conjunction, since the LMP congestion component under AC-based shift factor is not applicable for congestion revenue right settlement, this paper proposes the use of DC-based shift factor together with the shadow price from the AC-based shift factor optimization solution to determine a nodal based price for congestion revenue right settlement.
  • Keywords
    financial management; optimisation; power markets; risk management; scheduling; AC-based shift factor; DC-based shift factor; ISO energy market; LMP congestion component; congestion revenue right; energy inadequacy; financial risk; independent system operators; load location; lossless shift factor; marginal loss effect; marginal price; market optimization model; nodal based price; optimization solution; scheduling generation; transmission constraints modeling; Equations; Generators; ISO; Load flow; Mathematical model; Optimization; Propagation losses; Congestion Revenue Rights (CRRs); Locational Marginal Price (LMP); Loss Penalty Factor; Lossless; Lossy; Revenue Adequacy; Shift Factor;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering and Optimization Conference (PEOCO), 2013 IEEE 7th International
  • Conference_Location
    Langkawi
  • Print_ISBN
    978-1-4673-5072-3
  • Type

    conf

  • DOI
    10.1109/PEOCO.2013.6564551
  • Filename
    6564551