Overcurrent relays coordination for commercial building
Author
Aliman, O. ; Musirin, I.
Author_Institution
Fac. of Electr. & Electron. Eng., Univ. Malaysia Pahang, Pekan, Malaysia
fYear
2013
fDate
3-4 June 2013
Firstpage
608
Lastpage
612
Abstract
This paper presents an overcurrent relays coordination study for an 11 kV commercial building in southern Malaysia. Nevertheless, the actual study that covers the overcurrent relays, earth fault relays and earth leakage relays were executed by providing optimum and functionable relay settings prior to commissioning of the building. The calculated settings and proposed adjustment settings have been verified and simulated by ETAP power tool for predictive sequence and tripping time delay during fault. Based on the proven proposed settings, the coordination study been accepted by the concerned authority body and suggested for implementation accordingly.
Keywords
building management systems; commissioning; earthing; overcurrent protection; power system faults; relay protection; ETAP power tool; building commissioning; commercial building; earth fault relays; earth leakage relays; functionable relay settings; optimum relay settings; overcurrent relays coordination; predictive sequence; southern Malaysia; tripping time delay; voltage 11 kV; Energy management; Integrated optics; Optical switches; Relays; TV; ETAP; Radial power system; STAR view of relay curves; over-current relays; protection; relay coordination;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering and Optimization Conference (PEOCO), 2013 IEEE 7th International
Conference_Location
Langkawi
Print_ISBN
978-1-4673-5072-3
Type
conf
DOI
10.1109/PEOCO.2013.6564620
Filename
6564620
Link To Document