DocumentCode :
622445
Title :
Simultaneously scheduling production plan and maintenance policy for a single machine with failure uncertainty
Author :
Cui Wei-Wei ; Zhiqiang Lu
Author_Institution :
Sch. of Mech. Eng., Shanghai Jiao Tong Univ., Shanghai, China
fYear :
2013
fDate :
12-14 June 2013
Firstpage :
475
Lastpage :
480
Abstract :
This paper addresses the problem of finding robust production and maintenance schedules for a single machine with failure uncertainty. Since both the production and maintenance activities have impacts on the machine´s capacity and reliability, a joint model for integrating the production plan and maintenance policy to optimize the bi-objective of quality and solution robustness simultaneously is proposed. Then a simulation-based stochastic Genetic Algorithm is developed as a proactive scheduling approach to search for robust solutions. Computational results indicate that the solution performance can be significantly improved with our algorithm compared with the traditional way. And the balance of quality robustness and solution robustness is explored in detail.
Keywords :
genetic algorithms; maintenance engineering; production control; single machine scheduling; failure uncertainty; maintenance policy; maintenance schedules; production plan scheduling; quality robustness; robust production schedules; simulation-based stochastic genetic algorithm; single machine; solution robustness; Biological cells; Electric breakdown; Maintenance engineering; Production; Robustness; Schedules; Stochastic processes;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control and Automation (ICCA), 2013 10th IEEE International Conference on
Conference_Location :
Hangzhou
ISSN :
1948-3449
Print_ISBN :
978-1-4673-4707-5
Type :
conf
DOI :
10.1109/ICCA.2013.6564870
Filename :
6564870
Link To Document :
بازگشت