DocumentCode
625978
Title
Progress of developing the 10MW L-band multi-beam klystron
Author
Yong Wang ; Rui Zhang ; Junjie Fan ; Yong Zhong ; Wenxin Liu
Author_Institution
Key Lab. of High Power Microwave Sources & Technol., Inst. of Electron., Beijing, China
fYear
2013
fDate
21-23 May 2013
Firstpage
1
Lastpage
2
Abstract
The Development of the 10MW L-band multibeam klystron was started in the Institute of Electronics, Chinese Academy of Sciences (IECAS) three years ago. The electrical and structural designs for this klystron have been accomplished , in which many technical problems have been resolved. In the design of electron optical system, the uniform field multiple-lens focusing scheme was adopted, by which the paraxial multi-beams with good laminarity and fluctuation were obtained. In the design of beam-wave interaction system, the second harmonic cavity was used to enhance the beam-wave interaction efficiency and reduce the volume and weight of the klystron. Nowadays, the prototype is being fabricated and will be finished in one or two months. This paper presents the research progress on the 10MW L-band multi-beam klystron and the key technical issues resolved in detail.
Keywords
electron lenses; electron optics; klystrons; optical focusing; IECAS; Institute of Electronics, Chinese Academy of Sciences; L-band multibeam klystron; beam-wave interaction system; electron optical system; laminarity; paraxial multibeam; power 10 MW; second harmonic cavity; uniform field multiple-lens focusing scheme; Cathodes; Cavity resonators; Focusing; Klystrons; L-band; Laser beams; Prototypes; 10MW; L-band; multi-beam klystron; research progress;
fLanguage
English
Publisher
ieee
Conference_Titel
Vacuum Electronics Conference (IVEC), 2013 IEEE 14th International
Conference_Location
Paris
Print_ISBN
978-1-4673-5976-4
Type
conf
DOI
10.1109/IVEC.2013.6570926
Filename
6570926
Link To Document