• DocumentCode
    630334
  • Title

    Unexpected bi-directional operation of Phase-Shift Full-Bridge Converter in parallel operation system

  • Author

    Yeonho Jeong ; Shin-Young Cho ; Duk-You Kim ; Gun-Woo Moon ; Chong-Eun Kim

  • Author_Institution
    Div. of Electr. Eng., KAIST, Daejeon, South Korea
  • fYear
    2013
  • fDate
    3-6 June 2013
  • Firstpage
    999
  • Lastpage
    1004
  • Abstract
    This paper discusses the effects of unexpected bi-directional operation of Phase-Shift Full-Bridge Converter in cold redundancy (CR). According to growing trends for high efficiency at light-load, cold redundancy method is strongly required in parallel operation system. However, because of unexpected backward operation, the voltage stress of primary switches is severely increased. In this paper, the period of mode change from normal operation to backward operation is investigated. The detailed operations in backward mode are described and the main factors of the severe voltage stress are analyzed. Furthermore, characteristics of switch to reduce higher voltage stress are also presented in terms of selecting switches. The validity of this study is confirmed by the experimental results of prototype 1.6kW converters.
  • Keywords
    power convertors; CR; cold redundancy method; parallel operation system; phase-shift full-bridge converter; power 1.6 kW; primary switches; switch characteristics; unexpected backward operation; unexpected bidirectional operation; voltage stress reduction; Irrigation; Moon; Switches;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    ECCE Asia Downunder (ECCE Asia), 2013 IEEE
  • Conference_Location
    Melbourne, VIC
  • Print_ISBN
    978-1-4799-0483-9
  • Type

    conf

  • DOI
    10.1109/ECCE-Asia.2013.6579229
  • Filename
    6579229