DocumentCode :
633627
Title :
Research on the Early-Warning for Construction Project Cost Risk
Author :
Zi-mei Liu ; Ke-fan Xie
Author_Institution :
Sch. of Manage., Wuhan Univ. of Technol., Wuhan, China
fYear :
2013
fDate :
29-30 June 2013
Firstpage :
1127
Lastpage :
1129
Abstract :
The operation of construction project is a system engineering with dynamic characteristics, its completion usually affected by great uncertainty and risk, especially the cost risk. This paper aims to conduct theoretical and empiric analysis on the construction project cost risk issues caused by uncertainties and mismanagement, establish early-warning system of construction project cost risk, set up mathematical model to get early-warning indicators so as to estimate the risk level accurately and take measures in time to control the cost risk, and ensure the smooth implementation and completion of the construction project.
Keywords :
alarm systems; civil engineering; costing; industrial economics; project management; risk analysis; construction project cost risk; early warning system; mathematical model; project uncertainties; risk level estimation; Alarm systems; Indexes; Materials; Mathematical model; Risk management; Standards; Uncertainty; Construction Project Cost Risk; Early-warning; Indicator System; Mathematical Model;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Digital Manufacturing and Automation (ICDMA), 2013 Fourth International Conference on
Conference_Location :
Qingdao
Type :
conf
DOI :
10.1109/ICDMA.2013.265
Filename :
6598189
Link To Document :
بازگشت