DocumentCode :
637908
Title :
Maintenance practices for transmission overhead lines
Author :
Lee, M.K. ; Pak, C.W.
Author_Institution :
Power Syst. Bus. Group, CLP Power Hong Kong Ltd., Hong Kong, China
fYear :
2012
fDate :
18-21 Nov. 2012
Firstpage :
1
Lastpage :
6
Abstract :
Overhead lines (OHL) operating at 400kV, form the backbone of CLP Power´s transmission network. Unlike underground cables, overhead lines are vulnerable to external environmental attacks, such as adverse weather, high humidity, pollution, ground stability, vegetation, and flying objects etc. To ensure high reliability and availability of the overhead lines for bulk electricity transmission, cost effective maintenance strategies including the application of specific accessories and materials, such as lightning arrestor and high voltage insulation coating (HVIC) as well as tower refurbishment to mitigate the risks caused by lightning, pollution and typhoon are essential. CLP Power (CLPP) has adopted both preventive and condition-based strategies for Transmission overhead line (TOHL) maintenance for many years and has accumulated a lot of valuable experience and knowledge on the implementation of various maintenance and refurbishment practices. These practices have led to the achievement of world class service performance and contributed in the long term economic growth of Hong Kong.
Keywords :
arresters; insulation; maintenance engineering; poles and towers; power overhead lines; power system stability; power transmission economics; power transmission reliability; protective coatings; CLP power transmission network; CLPP; HVIC; Hong Kong; TOHL; condition-based strategy; cost effective maintenance strategy; electricity transmission; environmental pollution; flying object; ground stability; high voltage insulation coating; lightning arrestor; long term economic growth; tower refurbishment; transmission overhead line reliability; underground cable; vegetation; voltage 400 kV; High voltage insulation coating (HVIC); Lightning arrestor; Preventive and condition-based strategies; Tower refurbishment;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Advances in Power System Control, Operation and Management (APSCOM 2012), 9th IET International Conference on
Conference_Location :
Hong Kong
Electronic_ISBN :
978-1-84919-743-4
Type :
conf
DOI :
10.1049/cp.2012.2158
Filename :
6615068
Link To Document :
بازگشت