DocumentCode
638579
Title
Upgrading the London underground power supply system
Author
Stinton, Daren
Author_Institution
United Kingdom
fYear
2013
fDate
3-6 June 2013
Firstpage
27
Lastpage
33
Abstract
The increased power demand associated with the extensive programme of line upgrades planned to be undertaken on the underground network over the next 15 years means that the power system is required to be significantly augmented and upgraded.
fLanguage
English
Publisher
iet
Conference_Titel
Railway Electrification Infrastructure and Systems (REIS 2013), 6th IET Professional Development Course on
Conference_Location
London
Electronic_ISBN
978-1-84919-740-3
Type
conf
DOI
10.1049/ic.2013.0075
Filename
6617362
Link To Document