DocumentCode :
638595
Title :
Overhead line equipment design and pantograph interface
Author :
Warburton, Keith
Author_Institution :
Balfour Beatty Rail, UK
fYear :
2013
fDate :
3-6 June 2013
Firstpage :
242
Lastpage :
248
Abstract :
The key function of a railway Overhead Line Equipment (OLE) is to supply power to electric traction units. This transfer takes places at the moving interface between the OLE and pantograph and it is the primary function of the designers to ensure the fundamental compatibility of these two systems, and that optimum performance is achieved over a range of weather, speed and maintenance conditions. This paper describes the fundamental technical issues affecting this interface performance.
Keywords :
pantographs; power overhead lines; railway electrification; traction power supplies; OLE; electric traction units; maintenance conditions; pantograph interface; railway overhead line equipment design; speed conditions; weather conditions;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Railway Electrification Infrastructure and Systems (REIS 2013), 6th IET Professional Development Course on
Conference_Location :
London
Electronic_ISBN :
978-1-84919-740-3
Type :
conf
DOI :
10.1049/ic.2013.0091
Filename :
6617378
Link To Document :
بازگشت