• DocumentCode
    638595
  • Title

    Overhead line equipment design and pantograph interface

  • Author

    Warburton, Keith

  • Author_Institution
    Balfour Beatty Rail, UK
  • fYear
    2013
  • fDate
    3-6 June 2013
  • Firstpage
    242
  • Lastpage
    248
  • Abstract
    The key function of a railway Overhead Line Equipment (OLE) is to supply power to electric traction units. This transfer takes places at the moving interface between the OLE and pantograph and it is the primary function of the designers to ensure the fundamental compatibility of these two systems, and that optimum performance is achieved over a range of weather, speed and maintenance conditions. This paper describes the fundamental technical issues affecting this interface performance.
  • Keywords
    pantographs; power overhead lines; railway electrification; traction power supplies; OLE; electric traction units; maintenance conditions; pantograph interface; railway overhead line equipment design; speed conditions; weather conditions;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Railway Electrification Infrastructure and Systems (REIS 2013), 6th IET Professional Development Course on
  • Conference_Location
    London
  • Electronic_ISBN
    978-1-84919-740-3
  • Type

    conf

  • DOI
    10.1049/ic.2013.0091
  • Filename
    6617378