DocumentCode
638595
Title
Overhead line equipment design and pantograph interface
Author
Warburton, Keith
Author_Institution
Balfour Beatty Rail, UK
fYear
2013
fDate
3-6 June 2013
Firstpage
242
Lastpage
248
Abstract
The key function of a railway Overhead Line Equipment (OLE) is to supply power to electric traction units. This transfer takes places at the moving interface between the OLE and pantograph and it is the primary function of the designers to ensure the fundamental compatibility of these two systems, and that optimum performance is achieved over a range of weather, speed and maintenance conditions. This paper describes the fundamental technical issues affecting this interface performance.
Keywords
pantographs; power overhead lines; railway electrification; traction power supplies; OLE; electric traction units; maintenance conditions; pantograph interface; railway overhead line equipment design; speed conditions; weather conditions;
fLanguage
English
Publisher
iet
Conference_Titel
Railway Electrification Infrastructure and Systems (REIS 2013), 6th IET Professional Development Course on
Conference_Location
London
Electronic_ISBN
978-1-84919-740-3
Type
conf
DOI
10.1049/ic.2013.0091
Filename
6617378
Link To Document