• DocumentCode
    644978
  • Title

    A risk based approach for prioritizing electrical equipment replacement and repair

  • Author

    Cayanan, Christopher ; Navarro, Rafael ; Wagner, Emily

  • Author_Institution
    Oxy Long Beach, Inc., Long Beach, CA, USA
  • fYear
    2013
  • fDate
    23-25 Sept. 2013
  • Firstpage
    1
  • Lastpage
    8
  • Abstract
    Electrical infrastructure equipment in the petrochemical and/or oil and gas industry in North America is generally 40 or more years old. The life and reliability of electrical equipment in this age range can be compromised due to operating conditions such as exposure to moisture and chemicals, loading, temperature, vibration, and mechanical stress over the life of the equipment. Electrical equipment operating and life cycle philosophies tend to vary from age based replacement to run-to-failure. This results in an ad-hoc approach for determining the appropriate time for equipment replacements or major repairs. Limited resources, funding, and other competing projects exacerbate the issue. An operating and life cycle management philosophy using preventive and predictive maintenance results to prioritize equipment replacements and/or improvement will help optimize how to determine when equipment repair or replacement is justified. This paper will describe a systematic risk based approach of prioritizing electrical equipment replacement and repair projects to improve electrical reliability and safety. The approach uses probability and consequence techniques for equipment repair or replacement.
  • Keywords
    electrical safety; failure analysis; gas industry; petroleum industry; preventive maintenance; reliability; risk analysis; ad hoc approach; electrical equipment life; electrical equipment reliability; electrical equipment replacement priority; electrical infrastructure equipment; electrical safety; equipment repair; gas industry; life cycle management; oil industry; petrochemical industry; predictive maintenance; preventive maintenance; risk based approach; run-to-failure; Maintenance engineering; Oil insulation; Probability; Production; Reliability; Systematics; Temperature measurement; consequence; probability; probability/consequence categories; probability/consequence category elements; probability/consequence risk matrix; risk of failure;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Petroleum and Chemical Industry Technical Conference (PCIC), 2013 Record of Conference Papers Industry Applications Society 60th Annual IEEE
  • Conference_Location
    Chicago, IL
  • ISSN
    0090-3507
  • Print_ISBN
    978-1-4673-5108-9
  • Type

    conf

  • DOI
    10.1109/PCICon.2013.6666026
  • Filename
    6666026