DocumentCode
645770
Title
The effects of extended locational marginal pricing in wholesale electricity markets
Author
Thompson, G. ; Chao Li ; Muhong Zhang ; Hedman, Kory W.
Author_Institution
Sch. of Comput., Inf., & Decision Syst. Eng., Arizona State Univ., Tempe, AZ, USA
fYear
2013
fDate
22-24 Sept. 2013
Firstpage
1
Lastpage
6
Abstract
In this paper, two pricing mechanisms in electricity markets are studied, the locational marginal price (LMP) and the extended locational marginal price (ELMP). The effects of these two pricing mechanisms are compared with regards to the allocation of the market surplus between generators and loads. The two pricing mechanisms are also analyzed with regards to the required uplift payments. The results confirm that uplift payments are reduced under the ELMP pricing mechanism. However, ELMP does not appropriately represent the marginal market clearing price for the market dispatch solution.
Keywords
power generation dispatch; power generation economics; power markets; pricing; ELMP; extended locational marginal pricing mechanism; marginal market clearing price; market dispatch solution; market surplus allocation; uplift payment; wholesale electricity market; Economics; Electricity supply industry; Generators; Load flow; Load modeling; Mathematical model; Pricing; Extended locational marginal price; locational marginal price; non-convex markets; pricing mechanisms; uplifts;
fLanguage
English
Publisher
ieee
Conference_Titel
North American Power Symposium (NAPS), 2013
Conference_Location
Manhattan, KS
Type
conf
DOI
10.1109/NAPS.2013.6666921
Filename
6666921
Link To Document