  • Abstract
    Increasing penetration of wind and solar power will impact the operations of conventional generation on the power grid. Increased cycling - on/off as well as load following, and ramping will result in increased capital, operations and maintenance cost on existing assets. Recent renewable integration studies have included this incremental power plant cycling cost in their analysis to quantify the cost impacts of cycling and ramping of fossil-fueled generation. This refinement to the assessments of wind and solar impacts on the power system is important, however a gap exists in understanding how these costs should be applied to individual power plants. This analysis provides a guideline to develop standard measures to quantify past cycling of power plants, particularly coal and gas fired units. The authors present Equivalent Hot Starts (EHS) and Equivalent Operating Hours (EOH) as two factors that can be used to gauge power plant cycling.
  • Keywords
    power generation economics; power grids; solar power stations; steam power stations; wind power plants; EHS; EOH; equivalent hot starts; equivalent operating hours; future grid operation modeling; historical cycling evaluation; power plant cycling measure; coal; cycling; emissions; equivalent hot start; equivalent operating hours; gas; load following; ramping; wear and tear; wind;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Society General Meeting (PES), 2013 IEEE
  • Conference_Location
    Vancouver, BC
  • ISSN
    1944-9925
  • Type

    conf

  • DOI
    10.1109/PESMG.2013.6672754
  • Filename
    6672754