DocumentCode
648396
Title
Tandem hydro scheduling in Indian electricity market
Author
Dattaray, Papiya ; Abhyankar, Abhijit
Author_Institution
EES, IIT Delhi, New Delhi, India
fYear
2013
fDate
21-25 July 2013
Firstpage
1
Lastpage
5
Abstract
The paper gives a complete account of the various scheduling and moderation issues faced by the system operators (SO) at the Load despatch centres (LDCs) in India while furnishing generation despatch schedules for a system of Run-of-River (ROR) type of plants arranged in tandem. It looks into the clauses in the Indian Electricity Grid Code (IEGC) pertaining to hydrogenation along with providing a detailed account of the scheduling procedure followed today and tries to deliver compact solutions by developing optimization models for the same. Cumulative as well as individual plant generation schedules for 24 hours in a day are obtained for a system of cascaded run-of-river (ROR) type hydro plants while catering to varied objective functions in the Indian electricity market.
Keywords
hydroelectric power stations; optimisation; power generation dispatch; power generation scheduling; power markets; Indian electricity grid code; Indian electricity market; ROR type hydro plants; generation dispatch schedules; hydrogenation; load dispatch centres; optimization models; plant generation schedules; run-of-river type hydro plants; system operators; tandem hydro scheduling; Availability; Job shop scheduling; Optimal scheduling; Reservoirs; Schedules; Hydro generation Scheduling; ROR; Scheduling; moderation;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Society General Meeting (PES), 2013 IEEE
Conference_Location
Vancouver, BC
ISSN
1944-9925
Type
conf
DOI
10.1109/PESMG.2013.6672975
Filename
6672975
Link To Document