Title :
Planning of renewable energy considering the conditions of system control and location
Author :
Li Xi-Tong ; Kuang Hai-ju ; Litifu, Zulati
Author_Institution :
Inst. of Sci. & Technol. Inf., Xinjiang Uygru Autonomous Region, Urumqi, China
Abstract :
This paper presents the controlling system of Pico Hydro Power Plant (PHPP) and Micro Hydro Power Plant (MHPP) for the defined Region based on the developmental project under doing and being to do. Controller for PHPP is based on the direct control method that is widely used in pico degree hydro system. Controller for MHPP is based on the two kinds of isolated operation method and network connection method. This paper also shows an optimal procedure in installation of wind power turbine. Considering the tail affect of frond wind power turbine, mathematic model that can be used for determining the wind speed on the complex land shape is derived, and also the Wind Speed Reduction Coefficient is introduced by experimental values. The economical procedure in installation wind power turbine is also analyzed by considering the allowance of land using possibility.
Keywords :
hydroelectric power stations; power generation control; power generation planning; wind power plants; wind turbines; MHPP; PHPP; complex land shape; developmental project; direct control method; frond wind power turbine; isolated operation method; mathematic model; microhydropower plant; network connection method; pico degree hydro system; pico hydropower plant; renewable energy planning; system control conditions; wind power turbine; wind speed; wind speed reduction coefficient; Control systems; Power system reliability; Reliability; Wind power generation; Wind speed; Wind turbines; Controlling system; Hydro power; optimal installation; stability and reliability;
Conference_Titel :
Advanced Mechatronic Systems (ICAMechS), 2013 International Conference on
Conference_Location :
Luoyang
Print_ISBN :
978-1-4799-2518-6
DOI :
10.1109/ICAMechS.2013.6681716