DocumentCode
658073
Title
Job-shop production scheduling with reverse flows
Author
Abdeljaouad, Mohamed Amine ; Bahroun, Zied ; Omrane, Ahmed ; Fondrevelle, Julien
Author_Institution
LIP2, FST, Tunis, Tunisia
fYear
2013
fDate
6-8 May 2013
Firstpage
829
Lastpage
834
Abstract
In this paper, we present a modeling approach for the NP-hard scheduling problem Job-shop with reverse flows. This problem is characterized by two flows that cover the same machines but in opposite senses. The objective is to minimize the maximum completion time of the jobs. We start by providing a mathematical formulation and we analyze the complexity and some particular cases of the problem. Then, we propose a heuristic method for solving the NP-hard 3-machine case, which we evaluate by conducting tests on Taillard´s benchmark. These tests give satisfying results and show that the heuristic ensures good performance when the two flows have close numbers of jobs.
Keywords
computational complexity; job shop scheduling; recycling; reverse logistics; NP-hard 3-machine; NP-hard scheduling problem; Taillard benchmark; job-shop production scheduling; reverse flows; Benchmark testing; Complexity theory; Equations; Job shop scheduling; Mathematical model; Radiation detectors; Flow-shop; Job-shop; Reverse flows; Scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Control, Decision and Information Technologies (CoDIT), 2013 International Conference on
Conference_Location
Hammamet
Print_ISBN
978-1-4673-5547-6
Type
conf
DOI
10.1109/CoDIT.2013.6689650
Filename
6689650
Link To Document