• DocumentCode
    661963
  • Title

    Analysis of cross-borehole pulse radar signatures on a half water-filled tunnel

  • Author

    Ji-Hyun Jung ; Se-Yun Kim

  • Author_Institution
    Imaging Media Res. Center, Korea Inst. of Sci. & Technol., Seoul, South Korea
  • fYear
    2013
  • fDate
    5-8 Nov. 2013
  • Firstpage
    473
  • Lastpage
    475
  • Abstract
    The effect of the water collected in the bottom of an empty tunnel on cross-borehole radar signatures is analyzed using the finite-difference time-domain (FDTD) method. The cross-borehole pulse radar is represented by 3-dimensional model and B-scan images are calculated in two cases of fully air-filled and half water-filled tunnels. The first positive peak in the B-scan image appears in a later time and moves upward direction than the tunnel center as the water is collected in tunnel. To estimate the central position of the half water-filled tunnel, the first negative peak is adopted here and its utility is described clearly.
  • Keywords
    drilling (geotechnical); electromagnetic pulse; finite difference time-domain analysis; remote sensing by radar; tunnels; 3 dimensional model; B-scan image; FDTD method; cross borehole pulse radar signature; empty tunnel; finite difference time domain method; fully air filled tunnel; half water filled tunnel; Dipole antennas; Dispersion; Finite difference methods; Radar antennas; Radar imaging; Time-domain analysis; Cross-borehole; FDTD; pulse radar; water-filled tunnel;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Microwave Conference Proceedings (APMC), 2013 Asia-Pacific
  • Conference_Location
    Seoul
  • Type

    conf

  • DOI
    10.1109/APMC.2013.6694835
  • Filename
    6694835