DocumentCode
666919
Title
A new approach to integrate value stream analysis into a continuous energy efficiency improvement process
Author
Drechsel, Michael ; Bornschlegl, Martin ; Spreng, Simon ; Bregulla, Markus ; Franke, J.
Author_Institution
Audi Planung GmbH, Germany
fYear
2013
fDate
10-13 Nov. 2013
Firstpage
7502
Lastpage
7507
Abstract
Due to increasing energy costs and the demand to lower CO2 emissions in the production, companies try to integrate a continuous energy efficiency improvement process. By implementing the energy value stream analysis, an optimized improvement process can be established which leads to a more efficient production. This approach shows a practically optimized method. It enables a holistic analysis of the energy productivity and helps to identify and to realize sustainable solutions. Furthermore this structured improvement process leads to a higher transparency of energy consumers.
Keywords
energy conservation; value engineering; continuous energy efficiency improvement process; energy consumers; energy costs; energy productivity; energy value stream analysis; holistic analysis; optimized improvement process; Energy consumption; Energy management; Green products; Lubricants; Planning; Production systems; CIP; continuous improvement process; energy efficiency; energy management; energy measurement; energy value stream analysis; green design; green products; process planning; production planning;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Electronics Society, IECON 2013 - 39th Annual Conference of the IEEE
Conference_Location
Vienna
ISSN
1553-572X
Type
conf
DOI
10.1109/IECON.2013.6700382
Filename
6700382
Link To Document