    Transmission swtiching to relieve voltage violations in low load period

  • Author

    Guo, W.M. ; Wei, Qingping ; Liu, G.J. ; Yang, May ; Zhang, X.K.

  • Author_Institution
    Henan Electr. Power Res. Inst., Zhengzhou, China
  • fYear
    2013
  • fDate
    22-25 Oct. 2013
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    With the development of modern power system, extra-high voltage (EHV) AC transmission lines are widely used. Because of large capacitive charging, long EHV AC lines may cause voltage violations in low load period. The leading-phase operation of synchronous generators and switching on shunt reactors are two common measures to relieve voltage violations in low load period. In this paper, we propose that opening some EHV lines in low load period, namely transmission switching is a more economic and efficient measure. The problem of finding an optimal topology to relieve voltage violations in low load period is formulated as a mixed integer non linear programming problem. After some simplifications, the model is converted to an easily solved mixed integer linear program. The modified IEEE 30-bus test system is used to evaluate the applicability and effectiveness of the proposed method.
  • Keywords
    integer programming; nonlinear programming; power transmission economics; EHV AC lines; IEEE 30-bus test system; extra-high voltage AC transmission lines; low load period; mixed integer nonlinear programming problem; transmission switching; voltage violations; Generators; Load modeling; Power system stability; Power transmission lines; Reactive power; Security; Switches; EHV power system; Transmission switching; voltage violations;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    TENCON 2013 - 2013 IEEE Region 10 Conference (31194)
  • Conference_Location
    Xi´an
  • ISSN
    2159-3442
  • Print_ISBN
    978-1-4799-2825-5
  • Type

    conf

  • DOI
    10.1109/TENCON.2013.6718480
  • Filename
    6718480