• DocumentCode
    676603
  • Title

    Wind generation ramping coordinated control

  • Author

    Yongzhi Qi ; Yutian Liu

  • Author_Institution
    Key Lab. of Power Syst. Intell. Dispatch & Control of Minist. of Educ., Shandong Univ., Jinan, China
  • fYear
    2013
  • fDate
    9-11 Sept. 2013
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    This paper proposes a ramping coordinated control strategy which considers the temporal and spatial difference of wind farm group and the AGC ability of wind farms. According to certain grouping principles, wind farms in wind farm group are divided into several joint power generation units, to which the dispatching centre distributes its scheduling plan, while wind farms in each joint power generation unit coordinate to split the dispatching plan. In order to improve the control ability of wind farms, a new kind of wind generation automatic generation control strategy is proposed in which response speed is promoted. Simulation results show that the proposed strategy can improve the output characteristics of wind power.
  • Keywords
    power generation control; power generation dispatch; power generation scheduling; wind power plants; AGC; joint wind power generation units; response speed; scheduling plan; wind farm group; wind generation automatic generation control strategy; wind generation ramping coordinated control strategy; joint power generation unit; ramping control; wind generation automatic generation control; wind generation ramping;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Renewable Power Generation Conference (RPG 2013), 2nd IET
  • Conference_Location
    Beijing
  • Electronic_ISBN
    978-1-84919-758-8
  • Type

    conf

  • DOI
    10.1049/cp.2013.1815
  • Filename
    6718726