• DocumentCode
    679452
  • Title

    Multiprocessor Real-Time Scheduling with a Few Migrating Tasks

  • Author

    Santos, Jose A. ; Lima, George ; Bletsas, Konstantinos ; Kato, Shigeo

  • Author_Institution
    Comput. Sci. Dept., Fed. Univ. of Bahia, Salvador, Brazil
  • fYear
    2013
  • fDate
    3-6 Dec. 2013
  • Firstpage
    170
  • Lastpage
    181
  • Abstract
    We present HIME, a new EDF-based semi-partitioned scheduling algorithm which allows at most one migrating task per processor. In a system with m processors, this arrangement limits the migrating tasks to at most m/2 and the number of migrations per job to at most m-1. HIME has a utilisation bound of at least 74.9%, and can be configured to achieve 75%, the theoretical limit for semi-partitioned schemes with at most m/2 migrating tasks. Experiments show that the average system utilisation achieved by HIME is about 95%.
  • Keywords
    multiprocessing systems; processor scheduling; EDF-based semipartitioned scheduling algorithm; HIME; migrating tasks; multiprocessor real-time scheduling; utilisation bound; Clustering algorithms; Optimization; Resource management; Scheduling; Scheduling algorithms; Upper bound; EDF-based scheduling algorithm; Multiprocessing systems; Real-time systems;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Real-Time Systems Symposium (RTSS), 2013 IEEE 34th
  • Conference_Location
    Vancouver, BC
  • ISSN
    1052-8725
  • Type

    conf

  • DOI
    10.1109/RTSS.2013.25
  • Filename
    6728872