• DocumentCode
    684919
  • Title

    Re-entrant flow control in Q-time constraints processes for actual applications

  • Author

    Kobayashi, Akihiro ; Kuno, Takahiro ; Arima, Sumika

  • Author_Institution
    Univ. of Tsukuba, Tsukuba, Japan
  • fYear
    2013
  • fDate
    6-6 Sept. 2013
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    This paper presented solutions respond to three issues of scheduling of semiconductor manufacturing. As the First, we introduced how to apply SCKB-REFS rule, which is the optimal re-entrant flow dispatching for maximizing throughput of quality product in Q-time constraints processes, to the case of more than two different re-entrant flows. The performance of SCKB-REFS rule is evaluated by comparing with typical rules, FCFS-CT and LPFS-CT, in case that three different flows (i.e. specifications) share the same production tools. SCKB-REFS rule achieved the best performance in terms of mean cycle time and the throughput ratio in every traffic intensity as the result.
  • Keywords
    product quality; scheduling; semiconductor industry; FCFS-CT; LPFS-CT; Q-time constraints processes; SCKB-REFS rule; optimal re-entrant flow dispatching; production tools; quality product; re-entrant flow control; semiconductor manufacturing scheduling; traffic intensity; Buildings; Joints; Layout; product-mix loading; scheduling; setup; tool maintenance;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    e-Manufacturing & Design Collaboration Symposium (eMDC), 2013
  • Conference_Location
    Hsinchu
  • Type

    conf

  • DOI
    10.1109/eMDC.2013.6756052
  • Filename
    6756052