DocumentCode
685356
Title
Micro-turbine installation feasibility in bulk water reticulation pipelines
Author
Hakimi-Khiabani, Clifford ; Omar, I.
Author_Institution
Cape Peninsula Univ. of Technol., Bellville, South Africa
fYear
2013
fDate
20-21 Aug. 2013
Firstpage
1
Lastpage
4
Abstract
This paper presents an economic and theoretical feasibility study of the application of Micro Hydro Turbines at a case study Pressure Regulating Valve (PRV) site in a South African municipality´s bulk water supply system. By examining data collected from the case study site it is possible to determine the flow rate available and pressure of the supply water flowing through the PRV system. Using this data it is possible to determine the theoretical power production capabilities of this case study site. The overall results of the study show a promising theoretical production capacity of about 39000 kWh per annum from the installation of Micro Hydro Turbines at the case study PRV site, equating to a electricity cost saving of around R48 000.
Keywords
hydraulic turbines; pipelines; power generation economics; valves; water supply; PRV site; PRV system; South African municipality bulk water supply system; bulk water reticulation pipelines; economic feasibility study; electricity cost saving; flow rate; microhydroturbines; microturbine installation feasibility; pressure regulating valve; supply water pressure; theoretical feasibility study; theoretical power production capability; theoretical production capacity; Cities and towns; Communities; Educational institutions; Hydraulic turbines; Libraries; Production;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial and Commercial Use of Energy Conference (ICUE), 2013 Proceedings of the 10th
Conference_Location
Cape Town
ISSN
2166-0581
Print_ISBN
978-0-9922041-3-6
Type
conf
Filename
6761676
Link To Document