DocumentCode :
690838
Title :
Injection mold replacement analysis in automotive industry
Author :
Suwannabool, T. ; Sutivong, D.
Author_Institution :
Dept. of Ind. Eng., Chulalongkorn Univ., Bangkok, Thailand
fYear :
2012
fDate :
10-13 Dec. 2012
Firstpage :
423
Lastpage :
427
Abstract :
Injection mold replacement decisions in the automotive industry are usually made by managers and engineers, who based primarily on their own experience. This paper presents an injection mold replacement analysis through the use of stochastic dynamic programming and benchmark from the case study. The algorithm determines a optimal production volume and age that give the minimum expected cost under time constraint. The solutions are presented as a decision chart for easy application and interpretation.
Keywords :
automobile industry; costing; dynamic programming; injection moulding; maintenance engineering; stochastic programming; automotive industry; benchmark; decision chart; injection mold replacement analysis; minimum expected cost; optimal production volume; stochastic dynamic programming; time constraint; Automotive engineering; Dynamic programming; Industries; Maintenance engineering; Mathematical model; Production; Stochastic processes; Injection mold; decision chart; maintenance; replacement analysis; stochastic dynamic programming;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IEEM), 2012 IEEE International Conference on
Conference_Location :
Hong Kong
Type :
conf
DOI :
10.1109/IEEM.2012.6837774
Filename :
6837774
Link To Document :
بازگشت