DocumentCode
690897
Title
Property of worker allocation optimization with two professional workers in limited-cycle multiple periods
Author
Xianda Kong ; Jing Sun ; Yamamoto, Hiroshi ; Matsui, Masaki
Author_Institution
Dept. of Manage. Syst. Eng., Tokyo Metropolitan Univ., Tokyo, Japan
fYear
2012
fDate
10-13 Dec. 2012
Firstpage
1267
Lastpage
1271
Abstract
In this paper, we deal with an assembly line with limited-cycle multiple periods with two kinds of workers. Skills of workers are assumed to be different. We consider an optimization problem for finding an allocation of workers to the line that minimizes total expected cost satisfying the demand. Then we propose a theorem of the property of the optimal worker allocation and discuss the other properties in conditions.
Keywords
assembling; optimisation; personnel; assembly line; limited-cycle multiple periods; optimal worker allocation; optimization problem; professional worker allocation optimization property; total expected cost minimization; worker skills; Delays; Industrial engineering; Job shop scheduling; Market research; Numerical models; Resource management; Worker allocation optimization; limited-cycle problem with multiple periods; processing efficiency;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2012 IEEE International Conference on
Conference_Location
Hong Kong
Type
conf
DOI
10.1109/IEEM.2012.6837947
Filename
6837947
Link To Document