• DocumentCode
    694066
  • Title

    Schedule risk analysis in construction project using RFMEA and Bayesian networks: The Cali-Colombia case study

  • Author

    Mican, C.A. ; Jimenez, Victor ; Perez, J.M. ; Borrero, J.A.

  • Author_Institution
    Dept. of Ind. Eng., Univ. del Valle, Cali, Colombia
  • fYear
    2013
  • fDate
    10-13 Dec. 2013
  • Firstpage
    415
  • Lastpage
    419
  • Abstract
    The projects in the construction sector are developed in complex and dynamic circumstances due to uncertainties and risks. The schedule risk is the probability that the project exceeds the initial programming, for which several methodologies are proposed; on the other hand very few of them have been used in countries where the economies are in development. This paper presents a case study of the construction industry in the city of Cali-Colombia, integrating the RMFEA prioritization method and the Bayesian Networks model for the schedule risk analysis in construction projects. It will be possible to identify the main own risks in this type of projects and the impact that they have in the probability of finishing the project on time.
  • Keywords
    belief networks; construction industry; failure analysis; probability; production engineering computing; risk analysis; scheduling; Bayesian networks; Cali-Colombia; RMFEA prioritization method; construction industry; construction project; probability; risk failure mode and effects analysis; schedule risk analysis; Bayes methods; Delays; Programming; Project management; Risk analysis; Schedules; Bayesian networks; RFMEA; construction projects; risk schedule;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IEEM), 2013 IEEE International Conference on
  • Conference_Location
    Bangkok
  • Type

    conf

  • DOI
    10.1109/IEEM.2013.6962445
  • Filename
    6962445