DocumentCode
694125
Title
Batching and sequencing of incompatible job families for a single machine problem
Author
Omar, Mohamed K. ; Suppiah, Yasothei
Author_Institution
Bus. Sch. Malaysia, Nottingham Univ., Semenyih, Malaysia
fYear
2013
fDate
10-13 Dec. 2013
Firstpage
733
Lastpage
737
Abstract
This paper extends the work of Omar and Suppiah [1] and proposes three combinations of heuristics that aim to minimize the total weighted tardiness for batching and sequencing of jobs originated from incompatible families with sequence dependent family setup time to be processed on a single machine. The developed three-combination include EDD-EDD, EDD-BATCS and ATC-BATCS. Computational performance experiments of EDD-EDD, EDD-BATCS and ATC-BATCS using 640 randomly generated instances was studied. The results indicate that the ATC-BATCS has outperformed the other two heuristics in terms of quality of the solution (minimizing total weighted tardiness).
Keywords
batch processing (industrial); job production systems; ATC-BATCS; EDD-BATCS; EDD-EDD; incompatible job families; job batching; job sequencing; sequence dependent family setup; single machine problem; total weighted tardiness; Batch production systems; Indexes; Job shop scheduling; Processor scheduling; Sequential analysis; Single machine scheduling; Incompatible families; heuristics; sequence dependent setup times;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2013 IEEE International Conference on
Conference_Location
Bangkok
Type
conf
DOI
10.1109/IEEM.2013.6962508
Filename
6962508
Link To Document