DocumentCode :
694141
Title :
Triple constraint considerations in the management of construction projects
Author :
Mokoena, T.S. ; Pretorius, J.H.C. ; Van Wyngaard, C.J.
Author_Institution :
Employee SCIP Eng. Group, Univ. of Johannesburg, Johannesburg, South Africa
fYear :
2013
fDate :
10-13 Dec. 2013
Firstpage :
813
Lastpage :
817
Abstract :
Projects over the years failed to be completed within the specified triple constraint, hence lack of development in skills and infrastructure. The objective of the research is to assess the triple constraint and determine sources of failures in order to increase the success rate of construction projects in South Africa and to give priority on the triple constraint. Both the contextual and fieldwork survey attribute failure of construction projects to lack of understanding and poor management of the triple constraint elements and trade-offs.
Keywords :
construction industry; project management; South Africa; construction project success rate; construction projects management; triple constraint considerations; triple constraint elements management; Complexity theory; Educational institutions; Monitoring; Project management; Schedules; Time factors; Cost; construction projects; scope; time; triple constraint;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IEEM), 2013 IEEE International Conference on
Conference_Location :
Bangkok
Type :
conf
DOI :
10.1109/IEEM.2013.6962524
Filename :
6962524
Link To Document :
بازگشت