Triple constraint considerations in the management of construction projects
Author
Mokoena, T.S. ; Pretorius, J.H.C. ; Van Wyngaard, C.J.
Author_Institution
Employee SCIP Eng. Group, Univ. of Johannesburg, Johannesburg, South Africa
fYear
2013
fDate
10-13 Dec. 2013
Firstpage
813
Lastpage
817
Abstract
Projects over the years failed to be completed within the specified triple constraint, hence lack of development in skills and infrastructure. The objective of the research is to assess the triple constraint and determine sources of failures in order to increase the success rate of construction projects in South Africa and to give priority on the triple constraint. Both the contextual and fieldwork survey attribute failure of construction projects to lack of understanding and poor management of the triple constraint elements and trade-offs.
Keywords
construction industry; project management; South Africa; construction project success rate; construction projects management; triple constraint considerations; triple constraint elements management; Complexity theory; Educational institutions; Monitoring; Project management; Schedules; Time factors; Cost; construction projects; scope; time; triple constraint;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2013 IEEE International Conference on
Conference_Location
Bangkok
Type
conf
DOI
10.1109/IEEM.2013.6962524
Filename
6962524
Link To Document