• DocumentCode
    694306
  • Title

    Selection of sub-contractors of the project while minimizing settlements of contractual penalties and success fees

  • Author

    Blaszczyk, T. ; Blaszczyk, Pawel

  • Author_Institution
    Dept. of Oper. Res., Univ. of Econ., Katowice, Poland
  • fYear
    2013
  • fDate
    10-13 Dec. 2013
  • Firstpage
    1689
  • Lastpage
    1693
  • Abstract
    Most of today´s projects are interdisciplinary and requires the involvement of contractors that specialize in different types of works. In various circumstances, it may be advisable to minimize their multiplicity or their diversification. In some cases it may be desirable to meet certain characteristics by contractors for selected tasks. The aim of this paper is to determine the model of selection of contractors in complex project from the point of view of the project owner or general contractor. As a methodological basis we use the multi-criterial decision model assigning each task to specific contractors in the project with the function of distribution of penalties arising from delayed completion and potential benefits in the event of early termination of the project.
  • Keywords
    procurement; project management; subcontracting; complex project; contractual penalties; multicriterial decision model; penalties distribution; project procurement; subcontractors; success fees; Contracts; Estimation; Optimization; Project management; Schedules; Software; Uncertainty; contractual penalty; project procurement; subcontractors selection; success fee;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IEEM), 2013 IEEE International Conference on
  • Conference_Location
    Bangkok
  • Type

    conf

  • DOI
    10.1109/IEEM.2013.6962698
  • Filename
    6962698