• DocumentCode
    704515
  • Title

    Achieving competitiveness through setup time reduction

  • Author

    Orta-Lozano, Minerva Mayela ; Villarreal, Bernardo

  • Author_Institution
    Universidad de Monterrey, Departamento de Ingeniería, San Pedro Garza Garcia, N.L. México
  • fYear
    2015
  • fDate
    3-5 March 2015
  • Firstpage
    1
  • Lastpage
    7
  • Abstract
    This paper has the purpose of describing the efforts of a Mexican company with several galvanizing lines, located in Monterrey, Mexico, to diminish setup time. The firm´s operations strategy requires a better performance of the plant in terms of line capacity utilization, more productivity and quicker response to market´s orders. The setup reduction project set to obtain those goals was organized to attack two fronts; The reduction of the time per setup, and the decrease of the number of setups.
  • Keywords
    Cities and towns; Companies; Containers; Load modeling; Marine vehicles; Ports (Computers); Transportation; Color setup; SMED; Setup time reduction; production sequencing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Operations Management (IEOM), 2015 International Conference on
  • Conference_Location
    Dubai
  • Print_ISBN
    978-1-4799-6064-4
  • Type

    conf

  • DOI
    10.1109/IEOM.2015.7093897
  • Filename
    7093897