DocumentCode
704515
Title
Achieving competitiveness through setup time reduction
Author
Orta-Lozano, Minerva Mayela ; Villarreal, Bernardo
Author_Institution
Universidad de Monterrey, Departamento de Ingeniería, San Pedro Garza Garcia, N.L. México
fYear
2015
fDate
3-5 March 2015
Firstpage
1
Lastpage
7
Abstract
This paper has the purpose of describing the efforts of a Mexican company with several galvanizing lines, located in Monterrey, Mexico, to diminish setup time. The firm´s operations strategy requires a better performance of the plant in terms of line capacity utilization, more productivity and quicker response to market´s orders. The setup reduction project set to obtain those goals was organized to attack two fronts; The reduction of the time per setup, and the decrease of the number of setups.
Keywords
Cities and towns; Companies; Containers; Load modeling; Marine vehicles; Ports (Computers); Transportation; Color setup; SMED; Setup time reduction; production sequencing;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Operations Management (IEOM), 2015 International Conference on
Conference_Location
Dubai
Print_ISBN
978-1-4799-6064-4
Type
conf
DOI
10.1109/IEOM.2015.7093897
Filename
7093897
Link To Document