• DocumentCode
    704538
  • Title

    Production sequencing in a fifth wheel industry: Case study

  • Author

    Upreti, Girish ; Sawhney, Rupy ; Atuahene, Isaac ; Maciel, Gerardo ; Mendez, Ricardo ; Covarrubias, Daniel ; Sanchez, Jhoselin ; Alcala, Victor

  • Author_Institution
    Ind. & Syst. Eng. Dept., Univ. of Tennessee, Knoxville, TN, USA
  • fYear
    2015
  • fDate
    3-5 March 2015
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Fifth wheel is a type of hitch mounted in the bed of a truck. Fifth wheel coupling provides the link between a trailer and the towing truck. Lean methodology is applied to handle production sequencing at fifth wheel industry. Due to high variation of final products and non-constant demand, there is no specific methodology to determine the quantity of production and its order. This results into overproduction and high number of inventory between welding and assembly, and also finished product. We propose a sequencing algorithm between painting and welding area that helps to reduce inventory and movements between welding and assembly. An evaluation is made on the feasibility of coordinating welding production and painting of parts in sequence. The simulation of current and future state indicates shorter lead time and lower work in process.
  • Keywords
    assembling; painting; welding; wheels; assembly; fifth wheel coupling; fifth wheel industry; lead time; painting; production sequencing; sequencing algorithm; towing truck; trailer; welding production; Assembly; Delays; Painting; Sequential analysis; Welding; Wheels; Fifth wheel; production plan; sequencing; variation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Operations Management (IEOM), 2015 International Conference on
  • Conference_Location
    Dubai
  • Print_ISBN
    978-1-4799-6064-4
  • Type

    conf

  • DOI
    10.1109/IEOM.2015.7093920
  • Filename
    7093920