DocumentCode :
706347
Title :
Assessment of productivity & availability in asynchronous production control
Author :
Weidemann, Hans-Jurgen ; Harbach, Friedrich
Author_Institution :
ABB Industrietechnik GmbH, D68167 Mannheim
fYear :
1999
fDate :
Aug. 31 1999-Sept. 3 1999
Firstpage :
142
Lastpage :
147
Abstract :
The paper summarizes a methodology to analyze and assess the productivity and availability of production lines with asynchronous production control algorithms. The method is based on a discrete Monte-Carlo simulation of a complete line including component failures and production timing as well as spare parts supply and human resource planning. An example based on data collected in existing installations shows the application results of methodology and simulation.
Keywords :
Availability; Data models; Maintenance engineering; Productivity; Timing; Availability; Production; Productivity; Simulation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control Conference (ECC), 1999 European
Conference_Location :
Karlsruhe, Germany
Print_ISBN :
978-3-9524173-5-5
Type :
conf
Filename :
7099289
Link To Document :
بازگشت