• DocumentCode
    706347
  • Title

    Assessment of productivity & availability in asynchronous production control

  • Author

    Weidemann, Hans-Jurgen ; Harbach, Friedrich

  • Author_Institution
    ABB Industrietechnik GmbH, D68167 Mannheim
  • fYear
    1999
  • fDate
    Aug. 31 1999-Sept. 3 1999
  • Firstpage
    142
  • Lastpage
    147
  • Abstract
    The paper summarizes a methodology to analyze and assess the productivity and availability of production lines with asynchronous production control algorithms. The method is based on a discrete Monte-Carlo simulation of a complete line including component failures and production timing as well as spare parts supply and human resource planning. An example based on data collected in existing installations shows the application results of methodology and simulation.
  • Keywords
    Availability; Data models; Maintenance engineering; Productivity; Timing; Availability; Production; Productivity; Simulation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control Conference (ECC), 1999 European
  • Conference_Location
    Karlsruhe, Germany
  • Print_ISBN
    978-3-9524173-5-5
  • Type

    conf

  • Filename
    7099289