DocumentCode
706347
Title
Assessment of productivity & availability in asynchronous production control
Author
Weidemann, Hans-Jurgen ; Harbach, Friedrich
Author_Institution
ABB Industrietechnik GmbH, D68167 Mannheim
fYear
1999
fDate
Aug. 31 1999-Sept. 3 1999
Firstpage
142
Lastpage
147
Abstract
The paper summarizes a methodology to analyze and assess the productivity and availability of production lines with asynchronous production control algorithms. The method is based on a discrete Monte-Carlo simulation of a complete line including component failures and production timing as well as spare parts supply and human resource planning. An example based on data collected in existing installations shows the application results of methodology and simulation.
Keywords
Availability; Data models; Maintenance engineering; Productivity; Timing; Availability; Production; Productivity; Simulation;
fLanguage
English
Publisher
ieee
Conference_Titel
Control Conference (ECC), 1999 European
Conference_Location
Karlsruhe, Germany
Print_ISBN
978-3-9524173-5-5
Type
conf
Filename
7099289
Link To Document