• DocumentCode
    707067
  • Title

    Assessment of productivity & availability in asynchronous production control

  • Author

    Weidemann, Hans-Jurgen ; Harbach, Friedrich

  • Author_Institution
    ABB Industrietechnik GmbH, Mannheim, Germany
  • fYear
    1999
  • fDate
    Aug. 31 1999-Sept. 3 1999
  • Firstpage
    4313
  • Lastpage
    4318
  • Abstract
    The paper summarizes a methodology to analyze and assess the productivity and availability of production lines with asynchronous production control algorithms. The method is based on a discrete Monte-Carlo simulation of a complete line including component failures and production timing as well as spare parts supply and human resource planning. An example based on data collected in existing installations shows the application results of methodology and simulation.
  • Keywords
    Monte Carlo methods; human resource management; maintenance engineering; production control; productivity; asynchronous production control; availability assessment; component failures; discrete Monte-Carlo simulation; human resource planning; production lines; production timing; productivity assessment; spare parts supply; Availability; Buffer storage; Maintenance engineering; Productivity; Timing; Welding; Availability; Production; Productivity; Simulation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control Conference (ECC), 1999 European
  • Conference_Location
    Karlsruhe
  • Print_ISBN
    978-3-9524173-5-5
  • Type

    conf

  • Filename
    7100012