• DocumentCode
    707166
  • Title

    Scheduling with automated systems at the Drau

  • Author

    Gernot Bitzan, D.I.

  • Author_Institution
    VERBUND, Osterreichische Elektrizitatswirtschafts-AG, Klagenfurt, Austria
  • fYear
    1999
  • fDate
    Aug. 31 1999-Sept. 3 1999
  • Firstpage
    4897
  • Lastpage
    4903
  • Abstract
    The chain of power plants at the Austrian Drau is a part of the Verbund system, the largest producer of electricity in Austria. Verbund produces (with its participations) about 25.000 GWh/a, that is app. 50% of Austria´s public power supply. The flexible storage and pondage power plants within the Verbund have a very special position, because the Verbund is responsible for the load balance in Austria.
  • Keywords
    energy storage; power generation scheduling; power plants; Austria public power supply; Austrian Drau; Verbund system; automated system; load balancing; pondage power plant; power storage; scheduling; Adaptation models; Manuals; Optimization; Power generation; Predictive models; Production; Schedules;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control Conference (ECC), 1999 European
  • Conference_Location
    Karlsruhe
  • Print_ISBN
    978-3-9524173-5-5
  • Type

    conf

  • Filename
    7100112