DocumentCode :
707166
Title :
Scheduling with automated systems at the Drau
Author :
Gernot Bitzan, D.I.
Author_Institution :
VERBUND, Osterreichische Elektrizitatswirtschafts-AG, Klagenfurt, Austria
fYear :
1999
fDate :
Aug. 31 1999-Sept. 3 1999
Firstpage :
4897
Lastpage :
4903
Abstract :
The chain of power plants at the Austrian Drau is a part of the Verbund system, the largest producer of electricity in Austria. Verbund produces (with its participations) about 25.000 GWh/a, that is app. 50% of Austria´s public power supply. The flexible storage and pondage power plants within the Verbund have a very special position, because the Verbund is responsible for the load balance in Austria.
Keywords :
energy storage; power generation scheduling; power plants; Austria public power supply; Austrian Drau; Verbund system; automated system; load balancing; pondage power plant; power storage; scheduling; Adaptation models; Manuals; Optimization; Power generation; Predictive models; Production; Schedules;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control Conference (ECC), 1999 European
Conference_Location :
Karlsruhe
Print_ISBN :
978-3-9524173-5-5
Type :
conf
Filename :
7100112
Link To Document :
بازگشت