DocumentCode :
707843
Title :
Using IEC 61850 process bus to meet NERC PRC-005-2 Condition Based Maintenance requirements
Author :
Hunt, Rich ; Ernst, Tom
Author_Institution :
GE Digital Energy, Apex, NC, USA
fYear :
2015
fDate :
March 30 2015-April 2 2015
Firstpage :
546
Lastpage :
552
Abstract :
Process bus uses distributed merging units to sample analog measurements such as currents and voltages. The use of redundant merging units allows relays to continuously monitor the performance of the merging units by comparing the values from each. This continuous monitoring meets NERC PRC-005-2 Condition Based Maintenance requirements, and eliminates the need for routine testing of protective relay analog circuits.
Keywords :
automatic testing; maintenance engineering; power system protection; IEC 61850 process bus; NERC PRC-005-2 condition based maintenance requirements; analog measurements; distributed merging units; protective relay analog circuits; Current measurement; Maintenance engineering; Merging; Microprocessors; Monitoring; Relays; Testing; Power system protection; automatic testing; system testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Protective Relay Engineers, 2015 68th Annual Conference for
Conference_Location :
College Station, TX
Print_ISBN :
978-1-4799-8721-4
Type :
conf
DOI :
10.1109/CPRE.2015.7102192
Filename :
7102192
Link To Document :
بازگشت