DocumentCode :
715115
Title :
Experiences with dynamic PMU compliance testing using standard relay testing equipment
Author :
Kilter, Jako ; Palu, Ivo ; Almas, Muhammad Shoaib ; VANFRETTI, LUIGI
Author_Institution :
Dept. of Electr. Power Eng., Tallinn Univ. of Technol., Tallinn, Estonia
fYear :
2015
fDate :
18-20 Feb. 2015
Firstpage :
1
Lastpage :
5
Abstract :
This paper presents the results of dynamic compliance testing of phasor measurement units (PMUs) from three different vendors in a laboratory environment. Testing is performed by providing three phase voltage and current injections to the VT and CT inputs of the PMUs through Freja-300 stand-alone protection relay test set. Testing is performed according to the standard “IEEE C37.242-2013 - IEEE Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control”. The paper discusses the test setup, testing process, calculation of performance evaluation parameters and overall test results of this project.
Keywords :
conformance testing; phasor measurement; power system reliability; relay protection; Freja-300 stand-alone protection relay test set; IEEE C37.242-2013; dynamic PMU compliance testing; laboratory environment; performance evaluation parameter calculation; phasor measurement units; power system application reliability; standard relay testing equipment; testing process; three phase current injection; three phase voltage injection; Delays; Iron; Phasor measurement units; Testing; Time factors; Time-frequency analysis; PMU calibration testing; Phasor Measurement Units; stand-alone testing; synchrophasors;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Innovative Smart Grid Technologies Conference (ISGT), 2015 IEEE Power & Energy Society
Conference_Location :
Washington, DC
Type :
conf
DOI :
10.1109/ISGT.2015.7131833
Filename :
7131833
Link To Document :
بازگشت