DocumentCode :
715897
Title :
HBSE and insulation coordination
Author :
Nute, Richard
Author_Institution :
Richard Nute Product Safety Consultant, Bend, OR, USA
fYear :
2015
fDate :
18-20 May 2015
Firstpage :
1
Lastpage :
6
Abstract :
Transient overvoltages are normal. Insulation must withstand not only the functional voltage, but also the transient overvoltages. A scheme called “insulation coordination” has been instituted by the International Electrical Commission to promulgate and standardize on coordinating the transient overvoltage suppression with insulation electric strength. This paper addresses the insulation requirements of the scheme.
Keywords :
electric strength; insulation co-ordination; overvoltage protection; transient analysis; HBSE; International Electrical Commission; insulation coordination; insulation electric strength; transient overvoltage suppression; IEC standards; Insulation; Surge protection; Surges; Switches; Transient analysis; electric strength; insulation coordination; overvoltage category; transient overvoltages;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Product Compliance Engineering (ISPCE), 2015 IEEE Symposium on
Conference_Location :
Chicago, IL
Type :
conf
DOI :
10.1109/ISPCE.2015.7138705
Filename :
7138705
Link To Document :
بازگشت