• DocumentCode
    719503
  • Title

    Scheduling of Site Battery Energy Storage for Demand Response Capacity

  • Author

    Shangyou Hao ; Coe, Scott

  • fYear
    2015
  • fDate
    15-17 April 2015
  • Firstpage
    169
  • Lastpage
    175
  • Abstract
    We explore scheduling issues relating to coordination between battery energy storage (BES) and contractual demand response (DR) resources in daily operations where the two types of resources are partially interchangeable and interact with each other. The proposed formulation models the daily operations of BE Sand DR that considers not only the physical constraints of BES, energy prices, and consumer preferences, but also more importantly the contractual capacity obligations for DR and uncertainties in the DR activation by a utility or system operator. Example simulation results are used to illustrate operational scenarios of BES and DR that should be coordinated to achieve multiple objectives of reducing purchasing costs, reducing curtailments, meeting DR obligations, and planning contingent operations when the contractual DR capacity is activated.
  • Keywords
    battery storage plants; cost reduction; power system economics; scheduling; DR obligations; battery energy storage; consumer preferences; contingent operation planning; contractual DR capacity; contractual DR resources; contractual demand response; curtailment reduction; demand response activation; energy prices; purchasing cost reduction; site BES scheduling; Batteries; Computational modeling; Discharges (electric); Load management; Load modeling; Planning;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Green Technologies Conference (GreenTech), 2015 Seventh Annual IEEE
  • Conference_Location
    New Orleans, LA
  • Type

    conf

  • DOI
    10.1109/GREENTECH.2015.13
  • Filename
    7150246