DocumentCode :
723583
Title :
Assessment of working conditions of 110 kV line - a case study
Author :
Kornatka, Miroslaw
Author_Institution :
Dept. of Electr. Power Eng., Tech. Univ. of Czestochowa, Czestochowa, Poland
fYear :
2015
fDate :
20-22 May 2015
Firstpage :
296
Lastpage :
300
Abstract :
The paper presents an assessment of the working conditions of 110 kV lines within a power company. Using Neplan software, the connections system of 110 kV lines together with points of feeder and load has been analyzed. Power flow was set for peak load of the whole power company. The power flow and resulting power losses for the whole area supplied by this company as well as transmission capacity for each line are determined. The results are analyzed using the nonparametric method of kernel estimators.
Keywords :
electricity supply industry; employee welfare; load flow; power cables; Neplan software; kernel estimator nonparametric method; power company; power flow; power line working condition assessment; power losses; power supply; power transmission capacity; voltage 110 kV; Bandwidth; Companies; Employee welfare; Histograms; Kernel; Load flow; Reactive power; kernel estimator; power flow; power line;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electric Power Engineering (EPE), 2015 16th International Scientific Conference on
Conference_Location :
Kouty nad Desnou
Type :
conf
DOI :
10.1109/EPE.2015.7161069
Filename :
7161069
Link To Document :
بازگشت