DocumentCode
723583
Title
Assessment of working conditions of 110 kV line - a case study
Author
Kornatka, Miroslaw
Author_Institution
Dept. of Electr. Power Eng., Tech. Univ. of Czestochowa, Czestochowa, Poland
fYear
2015
fDate
20-22 May 2015
Firstpage
296
Lastpage
300
Abstract
The paper presents an assessment of the working conditions of 110 kV lines within a power company. Using Neplan software, the connections system of 110 kV lines together with points of feeder and load has been analyzed. Power flow was set for peak load of the whole power company. The power flow and resulting power losses for the whole area supplied by this company as well as transmission capacity for each line are determined. The results are analyzed using the nonparametric method of kernel estimators.
Keywords
electricity supply industry; employee welfare; load flow; power cables; Neplan software; kernel estimator nonparametric method; power company; power flow; power line working condition assessment; power losses; power supply; power transmission capacity; voltage 110 kV; Bandwidth; Companies; Employee welfare; Histograms; Kernel; Load flow; Reactive power; kernel estimator; power flow; power line;
fLanguage
English
Publisher
ieee
Conference_Titel
Electric Power Engineering (EPE), 2015 16th International Scientific Conference on
Conference_Location
Kouty nad Desnou
Type
conf
DOI
10.1109/EPE.2015.7161069
Filename
7161069
Link To Document