• DocumentCode
    724124
  • Title

    Study on lead time control chart in multi-stage manufacturing systems

  • Author

    Zhang Meng ; Liu Ya-fen

  • Author_Institution
    Sch. of Econ. & Manage., Tianjin Univ. of Technol. & Educ., Tianjin, China
  • fYear
    2015
  • fDate
    23-25 May 2015
  • Firstpage
    2009
  • Lastpage
    2012
  • Abstract
    Considering the lead time control problem of multi-stage manufacturing systems, a new queuing system based on multi-stage manufacturing systems is developed, in which the manufacturing times are exponentially distributed. By using the total probability decomposition and Markov process method, the lead time distribution function is obtained. Then, the lead time control chart is proposed using the time between events control chart, and the center line and control limits for the lead time are achieved by above method. Numerical examples show that the lead time can be well monitored by the lead time control charts.
  • Keywords
    Markov processes; control charts; manufacturing systems; probability; queueing theory; Markov process method; center line; control limits; events control chart; lead time control chart; lead time distribution function; manufacturing times; multistage manufacturing systems; probability decomposition; queuing system; Assembly; Control charts; Monitoring; Optimization; Process control; Production systems; Control Chart; Lead Time; Manufacturing Systems; Multi-stage; Time Between Events;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control and Decision Conference (CCDC), 2015 27th Chinese
  • Conference_Location
    Qingdao
  • Print_ISBN
    978-1-4799-7016-2
  • Type

    conf

  • DOI
    10.1109/CCDC.2015.7162251
  • Filename
    7162251