DocumentCode
724124
Title
Study on lead time control chart in multi-stage manufacturing systems
Author
Zhang Meng ; Liu Ya-fen
Author_Institution
Sch. of Econ. & Manage., Tianjin Univ. of Technol. & Educ., Tianjin, China
fYear
2015
fDate
23-25 May 2015
Firstpage
2009
Lastpage
2012
Abstract
Considering the lead time control problem of multi-stage manufacturing systems, a new queuing system based on multi-stage manufacturing systems is developed, in which the manufacturing times are exponentially distributed. By using the total probability decomposition and Markov process method, the lead time distribution function is obtained. Then, the lead time control chart is proposed using the time between events control chart, and the center line and control limits for the lead time are achieved by above method. Numerical examples show that the lead time can be well monitored by the lead time control charts.
Keywords
Markov processes; control charts; manufacturing systems; probability; queueing theory; Markov process method; center line; control limits; events control chart; lead time control chart; lead time distribution function; manufacturing times; multistage manufacturing systems; probability decomposition; queuing system; Assembly; Control charts; Monitoring; Optimization; Process control; Production systems; Control Chart; Lead Time; Manufacturing Systems; Multi-stage; Time Between Events;
fLanguage
English
Publisher
ieee
Conference_Titel
Control and Decision Conference (CCDC), 2015 27th Chinese
Conference_Location
Qingdao
Print_ISBN
978-1-4799-7016-2
Type
conf
DOI
10.1109/CCDC.2015.7162251
Filename
7162251
Link To Document