DocumentCode
727870
Title
Scheduling and batching in multi-site flexible flow shop environments
Author
Santos, A.S. ; Madureira, A.M. ; Varela, M.L.R. ; Putnik, G.D. ; Emrul Kays, H.M. ; Karim, A.N.M.
fYear
2015
fDate
17-20 June 2015
Firstpage
1
Lastpage
6
Abstract
Global competition and the customers demand for customized products with shorter due dates, marked the introduction of the Extended Enterprise. In this Extended Manufacturing Environment (EME), lean, virtual, networked and distributed enterprises collaborate to respond to the market demands. In this paper we study the influence of the batch size on Flexible Flow Shop makespan minimization problem FFC||Cmax for two multi-sites approaches, the FSBF (Flow Shop Based Factories) and the PMBF (Parallel-Machines Based Factories). The computational study demonstrates how the performance of the PMBF model decreases with the increase of batch size and determines the batch sizes in which the performance is similar.
Keywords
flow shop scheduling; manufacturing data processing; parallel machines; EME; PMBF model; customer demand; customized product; extended manufacturing environment; multisite flexible flow shop environment; parallel-machine-based factories; Computational modeling; Job shop scheduling; Manufacturing; Production facilities; Schedules; Transportation; Batching; Extended Manufacturing Environment; Flow Shop Based Factories; Multi-Site Flexible Flow Shop; Parallel-Machines Based Factories;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Systems and Technologies (CISTI), 2015 10th Iberian Conference on
Conference_Location
Aveiro
Type
conf
DOI
10.1109/CISTI.2015.7170525
Filename
7170525
Link To Document