DocumentCode :
735617
Title :
Uncontrolled islanding operations of MV/LV active distribution networks
Author :
Cerretti, Alberto ; D´Orazio, Luigi ; Pezzato, Cristiano ; Sapienza, Gianluca ; Valvo, Giovanni ; Cammalleri, Nicola ; Mattavelli, Paolo ; Sgarbossa, Riccardo ; Turri, Roberto ; De Berardinis, Ettore
Author_Institution :
ENEL Distribuzione, Italy
fYear :
2015
fDate :
June 29 2015-July 2 2015
Firstpage :
1
Lastpage :
6
Abstract :
In many countries different technical rules have been introduced in order to integrate the DG units in the medium voltage (MV) and low voltage (LV) distribution network. New standards state requirements for all generators, included inverter based ones, imposing a Fault Ride Through (FRT) philosophy and new active and reactive power regulation actions with the aim of maintaining the transmission system stability at the level it was with traditional rotating generators, or even increasing it. These technical rules may not be fully compliant with the automatic reclosing cycle usually performed from the CB at the beginning of MV feeders and/or with the automatic procedure of faulty section selection and supply restore to healthy ones. In this paper the effects of DG units connected at MV and LV voltage level in relation to different fault conditions are analyzed. The possibility of temporary uncontrolled islanded operations are investigated in order to evaluate the role of new Standards or Regulatory or Law requirements in the automatic reclosing procedure and MV network automation.
Keywords :
Circuit faults; Generators; Islanding; Load modeling; Reactive power; Standards; Threshold voltage; Distributed generation; automatic selection procedure of faulted line segment; fault conditions;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
PowerTech, 2015 IEEE Eindhoven
Conference_Location :
Eindhoven, Netherlands
Type :
conf
DOI :
10.1109/PTC.2015.7232459
Filename :
7232459
Link To Document :
بازگشت